A full-gut Scottsdale renovation can create pressure to order everything early. A better buying plan distinguishes what is chosen, what is technically verified and what is ready for release. Use these phases with your contractor and design team to organize a whole-home materials brief for HIBC Platinum. This is a purchasing decision tool, not a construction sequence or a promise of delivery dates.
Your home. A clearer way to buy.
Plan the whole home before you commit.
Bring your room-by-room materials scope and builder’s proposal. Let’s discuss whether Platinum fits the actual purchasing plan.
No payment or membership is required to make a request. HIBC is a buying program, not a remodeling contractor.
Phase one: define what can be priced now
List the rooms and materials in the project, then separate fixed decisions from conditions that are still unknown. A finish direction may be settled while quantities, openings or connection locations remain provisional. Ask the responsible professional which facts can be confirmed from current records and which require further site assessment.
Request preliminary pricing only where the assumptions can be stated clearly. Keep an assumptions list beside each quote: drawing version, estimated quantity, selected product and excluded work. That makes the price useful for planning without pretending it is a final order. Do not release an affected item simply because its preliminary quote arrived before the rest of the project.
Phase two: close the decisions that control other purchases
Ask your contractor and designer to identify decisions that affect multiple categories. Appliance specifications can affect cabinetry; cabinetry can affect the countertop plan; room finishes can affect adjacent transitions. Record the relationship for your actual products rather than adopting a generic installation rule from a checklist.
For each dependency, name the person who can confirm it and the evidence required. That could be a current approved drawing, final field measurement or product installation document reviewed by the appropriate professional. Keep design approval and order approval separate. If the project changes after a condition is uncovered, revise the dependent quotes before treating them as current.

Phase three: align purchase releases with the approved project
Scottsdale's permit services guidance distinguishes approval requirements by scope. Confirm the actual property's jurisdiction and the applicable permit and association processes with the responsible parties. The materials plan should use the construction scope they confirm, not assume approval from a completed mood board.
Ask the project team to define release conditions for each purchase. For example, a cabinet package might remain on hold pending final measurements and an accepted appliance schedule. This is an illustrative decision gate, not a universal technical rule. Obtain current seller lead-time information and ask how quote validity, substitutions and storage charges are handled if the site is delayed.
Phase four: prepare to receive and inspect each package
A materials release should have a receiving plan attached. Identify the delivery location, who will be present and the procedure for checking quantities and condition. Confirm packaging and access requirements, along with the seller's instructions for reporting an issue. Keep the relevant contact details available to the agreed receiver.
Ask the contractor or qualified project professional to confirm when storage and installation conditions are suitable for the exact products. Purchasing several categories together does not mean they should all arrive on the same day. Compare any proposed staging, storage or redelivery charges before choosing the delivery arrangement. Protecting a schedule includes having a plan for products that arrive before the site is ready.
Phase five: keep changes from spreading silently
The Arizona ROC guidance recommends a written change process addressing cost and timing. Maintain one list of current selections and mark replaced versions clearly. When a change is proposed, identify every affected quote, room and order before approving it.
Bring HIBC that controlled materials brief for a Platinum discussion. Platinum addresses new-home or full-gut whole-home materials planning; verify the exact benefits and product eligibility for this project. It does not replace your construction team or guarantee procurement management, site supervision or scheduling. If a proposed purchasing route leaves critical tasks unassigned, resolve them before judging the membership on product prices alone. A phased plan should make the buying decision clearer, not create more coordination than you are prepared to manage.
Materials release board
Use one row per package. Keep this with your private project records. The responsible professionals determine the technical requirements and construction sequence.
Copy these prompts into private notes. This worksheet does not collect or submit information.
01
Cabinetry
- Evidence required to release
- Approved plan, verified measurements and exact product specification
- Receiving and change owner
- Named receiver; drawing-change approver
02
Appliances
- Evidence required to release
- Selected model requirements reviewed for the plan
- Receiving and change owner
- Delivery contact; substitution approver
03
Surfaces
- Evidence required to release
- Applicable measurements and fabrication decisions confirmed
- Receiving and change owner
- Handling/installation contact; revision owner
04
Flooring
- Evidence required to release
- Product, areas and project sequence confirmed
- Receiving and change owner
- Suitable storage contact; quantity approver
05
Bathroom materials
- Evidence required to release
- Exact applications and trade requirements confirmed
- Receiving and change owner
- Receiver; compatibility reviewer
06
Other whole-home items
- Evidence required to release
- Eligibility, complete quote and readiness confirmed
- Receiving and change owner
- Responsible purchaser and issue contact
Put membership behind a clear buying plan.
HIBC provides confidential wholesale buying access with no HIBC product markup. Independent showrooms provide design and pricing; your separately hired professionals handle installation and construction.
Gold · Kitchen, bath & flooring
Bring your room plans into focus.
$4,995
First year. From Year 2, the $495 annual renewal is optional and purchased separately. No automatic subscription or auto-charge.
Start with your itemized kitchen or materials quote. Compare the complete club purchase plus dues before deciding.
Platinum · New home & full-gut remodel
Consider the whole materials plan.
$24,995
One-time enrollment fee for projects requiring coordinated whole-home materials planning. Confirm the specific benefits, eligible purchasing scope and applicable continuation terms with HIBC.
A larger budget alone does not establish fit. Bring the room-by-room scope and your builder’s responsibilities.
Questions before your next step.
Should I order everything before demolition?
There is no universal answer. Have the contractor, designer and seller identify what is verified, what depends on site findings, and what the order terms allow. Use those project-specific facts to decide release timing.
Does a Platinum membership include managing these phases?
Do not assume construction or procurement management is included. Confirm the actual membership services and separately assign order approvals, receiving, storage, trade work and schedule management.
Turn the materials list into a membership conversation.
Share the rooms, specifications and builder handoffs you have in mind. Ask HIBC to confirm the Platinum scope that applies to your project.
Sources and planning limits.
Reviewed October 15, 2026. Confirm current product instructions, project-specific approvals and offer terms before ordering. This is buying guidance, not installation or legal advice. Source references do not establish a supplier relationship.