Plan an Atlanta pre-1978 kitchen remodel with Georgia RRP certification questions, a lead-safe removal scope and cabinet-installation handoffs.
Plan my kitchen with a free design & quote
In this guide
A kitchen remodel in an older Atlanta-area home benefits from a careful removal plan before the new cabinetry is ordered. The important question is not only who installs the replacement cabinets. It is who evaluates the work involving existing painted surfaces, determines the applicable requirements and manages the transition to the new installation.
For homes built before 1978, put that conversation near the beginning of the project. You can still explore finishes and layout, while keeping the removal and site-readiness decisions with appropriately qualified professionals.
Start with the home's age and the exact work
Collect the construction year from available property records and share it with prospective contractors. If the date is uncertain, say so rather than treating a guess as a confirmed fact.
Describe the proposed work beyond “replace cabinets.” Include removal of existing cabinets, changes to attached trim or soffits, backsplash work, wall repairs and relocation of utilities where planned. Ask which activities may disturb painted surfaces and require further evaluation.
A pre-1978 construction date does not establish that every cabinet contains lead. Equally, a modern-looking cabinet door does not answer questions about painted walls or trim affected by removal. Let the responsible professional determine how the actual work and conditions affect the scope.
Follow the Georgia program
The Georgia Environmental Protection Division's RRP information explains certification and lead-safe requirements for covered renovation, repair and painting work in pre-1978 properties. Its contractor information identifies both Georgia renovation-firm and renovator certifications.
Georgia operates its own authorized program. The EPA's RRP overview lists Georgia among the jurisdictions administering their own programs. Ask about current Georgia credentials for the firm and responsible renovator, rather than assuming a general remodeling license or an EPA reference alone answers the question.
Have the contractor confirm the applicability of the rules to your project. For unresolved questions, use Georgia EPD's published contact resources.
Verify the roles, not just the sales presentation
Ask the business proposing the work for its firm name, applicable certification details and the identity of the renovator responsible for the project. Confirm how you can verify current credentials through Georgia EPD.
If a general contractor intends to hire another company for removal, ask which company will actually perform and supervise that scope. The name on the main remodeling proposal may differ from the firm responsible for the regulated work.
Also identify who installs the new cabinetry. If that is another business, ask how the teams will communicate about the work area, timing and readiness. A written assignment of responsibilities is more useful than an informal assurance that “the crew handles it.”

Create a lead-safe scope-and-handoff sheet
Use these fields in the request for proposals:
| Planning field | Information to request |
|---|---|
| Property information | Address, construction year and any uncertainty |
| Proposed disturbance | Specific surfaces and activities requiring review |
| Applicability decision | Responsible professional and documented basis |
| Performing firm | Business name and applicable current certification |
| Responsible renovator | Name and applicable certification details |
| Household arrangements | Professional instructions about access and use of affected areas |
| Work completion | Required cleaning, verification and records for the applicable scope |
| Installation handoff | Who confirms the next trade may proceed and how |
| Scope changes | Process if additional painted surfaces or work are discovered |
This worksheet organizes a contractor conversation. It is not a testing protocol, demolition method or certificate that the room is ready for use.
Ask what the proposal includes
Request an explanation of the lead-safe scope in the written quotation. Ask how any required evaluation, preparation, work practices, cleanup, verification and documentation are addressed. Have the firm identify exclusions and dependencies.
Do not compare two removal prices as equivalent if one proposal explains these responsibilities and the other leaves them unresolved. Ask each bidder to clarify the same project description before comparing totals.
Keep the new cabinet product quote separate from this work. A showroom can help specify cabinetry, but product selection does not determine the lead-safe removal method or establish that the existing room has been appropriately evaluated.
Plan household arrangements with the responsible firm
Tell the contractor how the home will be occupied during the project, including relevant access needs. Ask for its instructions about work-area boundaries, household access and the timing of transitions.
Have the contractor explain what you should expect before work begins, whom to contact with a concern and how changes will be communicated. Share those instructions with household members and other hired trades.
Avoid creating your own cleanup or testing plan from an online checklist. If a health concern arises, seek advice from a qualified health professional; if the concern involves the renovation requirements or contractor credentials, contact Georgia EPD. Those are different questions with different sources of help.
Protect the design from premature assumptions
The cabinet design may depend on conditions revealed during professionally managed removal. Ask the designer and contractor which dimensions or details need field confirmation before the final order is released.
Keep appliance specifications, wall dimensions and finished-surface assumptions identified in the drawing set. If the plan includes removing a soffit or altering a wall, have the relevant professionals resolve that work before treating the resulting space as guaranteed cabinet capacity.
Ask the seller what can be priced provisionally and what must be finalized. Obtain written terms for any order hold or staged release. A preliminary rendering can support design decisions without being mistaken for a final, site-verified production plan.
Define the handoff before scheduling installation
Ask the responsible firm what records apply at completion and who receives them. Have the contractor explain the applicable cleaning-verification or other completion process; do not assume every project requires the same type of report or a document called a clearance certificate.
Then identify who tells the cabinet installer that its work may begin. Confirm that remaining preparation, required inspections and field measurements have their own owners. Keep that handoff in the schedule and project records.
The cabinet delivery and installation coordination guide can help organize the later purchasing and trade sequence.
Bring a clear brief to your kitchen design conversation
HIBC is an online membership buying club. HIBC coordinates free kitchen design through independent showrooms; independent suppliers prepare product quotations, and installation and specialized renovation services are separate.
You can request free kitchen design and a product quote before deciding to join. Share the home's age, proposed layout and the professional scope decisions already made. Identify anything still awaiting evaluation so the design conversation respects those dependencies.
For the broader local planning path, visit the Atlanta kitchen design guide. Thoughtful early coordination lets you pursue the kitchen you want while giving the existing home—and the people doing the work—the right professional attention.